Client

Kildare County Council

Consultant

Atkins

Location

Naas Co.Kildare

Kilcullen Road Cycleway Update

John Cradock Ltd. on behalf of Kildare County Council have been carrying out major upgrade works to the Kilcullen Road (R448) as part of the Kilcullen Road Cycle Scheme.

We wish to inform you that during week commencing 4th September 2023, a change to the layout of the one-way system along the Kilcullen Road will be implemented to facilitate the next phase of works between Patrician Avenue and the Ballymore Road Junction.

The change to the traffic management layout is summarised below and presented on the plans below:

  • Inbound traffic from Patrician Avenue to the Ballymore Road Junction will remain uninterrupted during this phase of work.
  • Outbound traffic from Naas to the Kilcullen Road Roundabout will follow the diversion route along the Ballymore Road.
  • Two-way access from the Kilcullen Road Roundabout to Rathasker Heights will be facilitated in this phase of work.
  • Pedestrian movement shall be curtailed to one available footpath through the works area for the works duration, however safe and appropriate access shall be maintained at all times.

This traffic management layout will be in place until mid-October 2023 upon which a new traffic management layout will be implemented to facilitate the next phase of works.
We apologies for any inconvenience caused and shall continue to provide project updates via our website www.johncradock.ie and through future advance notifications.

Our Latest Traffic Management Update can be found on the link below:

/sites/default/files/user_media/1._kilcullen_road_cycle_-advanced_notification.pdf

The Phased construction extents can be found on the link below:

/sites/default/files/user_media/950002_phased_construction_extents.pdf

The Design General Arrangement Drawings can be found on the link below:

/sites/default/files/user_media/950101_general_arrangement_-_sheet_1_of_4.pdf

/sites/default/files/user_media/950102_general_arrangement_-_sheet_2_of_4.pdf

/sites/default/files/user_media/950103_general_arrangement_-_sheet_3_of_4.pdf

/sites/default/files/user_media/950104_general_arrangement_-_sheet_4_of_4.pdf

Traffic Management Drawings can be found on the link below:

/sites/default/files/user_media/c23001_00_002_rev01_kilcullen_road_cycle_scheme_-_phase_1_stage_1a.pdf

/sites/default/files/user_media/c23001_00_003_rev00_kilcullen_road_cycle_scheme_-_phase_1_stage_2a.pdf

/sites/default/files/user_media/c23001_00_003a_rev00_kilcullen_road_cycle_scheme_-_phase_1_stage_2a_-_diversion_route.pdf

 

Share This